Potential maximised

Working to a tight budget can provide some challenges. To allow for funding restraints the first classroom was constructed with the view of adding another classroom at a later date.

A tight site in the center of the school offered some obstacles. Safety of students and disruption to school life was minimised through clear communication with staff,

The classroom conform to modern learning standards with large glazed areas and bright interior decor.

An extensive basement area below allows ample space for safe storage of the school’s sport equipment.

 
 
  • Size:

  • Year: 2014

  • Location: Witherlea, Blenheim

  • Type: Educational
    Commercial

Previous
Previous

Renwick School

Next
Next

Waikawa Bay School